Surface area: 43,000 sqm
Date: 2017
Realization of all infrastructures required for the urbanization of a 100.000 sqm craft and industrial settlement area, with a variation on the city urban plan. Design of all infrastructural works serving the building sector, with particular focus on the hydraulic invariance, whose preservation required to adopt particularly complex design solutions, but functional and able to minimize future maintenance costs. Green areas and cycle paths connecting to the town complete the project. The public lighting system was realized through latest generation, low consumption solutions.